In a room full of UMWA members and miners from Contura’s Cumberland mine, the Department of Environmental Protection held a public hearing on the draft NPDES permit no. 033511, which would increase the permitted limits for sulfates and total dissolved solids (TDS) into the Monongahela River outfall 001 near Carmichaels, PA. CCJ Campaign Coordinator, Sarah, Community Organizer, Nick, and board members, Ken and Chuck, attended the event to stand up for common-sense permits.
At issue in this permitting decision is the fact that the Monongahela River was only recently considered to be recovered for sulfates. Now that it is no longer impaired, Cumberland Mine is seeking to increase the sulfates they can discharge into the river, pushing the river to 84% of its assimilative capacity – meaning that it is extremely close to the highest level it could safely take, a level that CCJ finds to be illegal and unreasonable. Unlike permits for new discharges, the mining company is seeking an increase in the level they may discharge, and workers testified at the public hearing that jobs would be on the line in this situation. However, the company is currently operating within the existing permit requirements without the threat of job loss. They also, according to permit documents, built a brand new water treatment facility for this outfall that they have never used in the past, yet they still have been in compliance with their existing permitted limits.
For those of our members and supporters who signed our petition asking the DEP not to authorize this permit, a copy was submitted with over 250 names attached to it. We expect to be contacted with a summary of the public hearing soon, and will keep you informed of any updates on this NPDES permit.